NVIDIA H100

The NVIDIA H100 is the first data-center GPU built on NVIDIA's Hopper architecture, announced in March 2022 with 80 billion transistors, HBM3 memory, FP8 Tensor Cores and a Transformer Engine aimed at large language models.

Era Large models

Architecture
Hopper
Type
GPU
Memory (GB)
80
Memory type
HBM3
Memory bandwidth (GB/s)
3350
Power (W)
700
Transistors (billion)
80
Release date
Developer
NVIDIA

What the H100 is

The NVIDIA H100 is a data-center GPU and the first chip built on the company's Hopper architecture[1]. It is designed for AI work — training large neural networks and serving them — and it succeeded the Ampere architecture, which NVIDIA had launched two years earlier[1]. Hopper takes its name from the computer scientist Grace Hopper[1].

Announcement and availability

NVIDIA announced the H100 on 22 March 2022 at its GTC conference. The company said at the time that the chip would be available from the third quarter of 2022[1].

Chip and memory

The H100 has 80 billion transistors and is manufactured on a TSMC 4N process tailored for NVIDIA[1]. NVIDIA described it as the first GPU to support PCIe Gen5, the interconnect used to attach add-in cards to a server, and the first to use HBM3 memory[1]. HBM is high-bandwidth memory: DRAM stacked in layers and placed close to the GPU die so that data moves over much wider paths than ordinary graphics memory allows.

In its SXM form the H100 carries 80 GB of HBM3 running at 3.35 TB/s, with a configurable thermal design power of up to 700 W[2]. NVIDIA quotes Tensor Core throughput of 1,979 teraflops at FP16 and 3,958 teraflops at FP8, figures given with sparsity — a technique that skips weights equal to zero, which multiplies the nominal rate[2]. A PCIe-based variant, the H100 NVL, has 94 GB per GPU at 3.9 TB/s[2].

Networking and new instructions

Fourth-generation NVLink gives each GPU 900 GB/s of GPU-to-GPU bandwidth, and an external NVLink Switch can connect up to 256 H100s into a single fabric[2]. That matters because a training run is normally spread across many GPUs that must exchange data constantly. The chip also introduced confidential computing, which protects data while it is being processed, and DPX instructions for dynamic-programming algorithms[2].

Transformer Engine and Tensor Cores

The H100's Transformer Engine was designed specifically for Transformer models, the neural-network architecture behind most large language models; NVIDIA said it speeds such models up by as much as 6x over the previous generation without losing accuracy[1]. The chip's fourth-generation Tensor Cores add FP8 precision, a number format that halves the storage and bandwidth needed compared with FP16; NVIDIA claims up to 4x faster training of GPT-3, a 175-billion-parameter model, than the prior generation[2].

Systems

The DGX H100, NVIDIA's eight-GPU server built around the chip, was rated at 32 petaflops of AI performance at FP8 precision[1].

Export controls

Before the H100 shipped, on 26 August 2022, the US government told NVIDIA that exports of the A100 and the "forthcoming H100" to China (including Hong Kong) and Russia required a licence[3]. NVIDIA said the restriction might affect its ability to complete H100 development on time[3]. The notice therefore arrived while the product was still being finished, and it put the chip inside a policy dispute from the start rather than after years on the market.

Place in the line

The H100 is the successor to Ampere and the chip with which NVIDIA began naming a feature — the Transformer Engine — after the model family it was built to accelerate[1][2]. Its specification sheet, from HBM3 and FP8 to NVLink Switch and a 700 W power envelope, describes the shape that large-scale AI hardware took as models grew: more memory bandwidth, lower-precision arithmetic, and bigger collections of GPUs wired together.

Version history

7
  1. 2016
    • Apr 5, 2016 NVIDIA Tesla P100

      The Tesla P100, announced by NVIDIA in April 2016, was the first data-center GPU on the Pascal architecture, and the first to combine stacked HBM2 memory, half-precision math aimed at deep learning and the NVLink interconnect.

  2. 2017
    • May 10, 2017 NVIDIA Tesla V100

      NVIDIA's first data-center GPU built on its Volta architecture, announced in May 2017. It added Tensor Cores, dedicated matrix-multiply units; OpenAI later trained its GPT-3 models on V100s.

  3. 2020
    • May 14, 2020 NVIDIA A100

      NVIDIA's A100 is a data-center GPU, the first built on the Ampere architecture. Announced on 14 May 2020, it introduced third-generation Tensor Cores, the TF32 format and Multi-Instance GPU, and became a standard building block for training large language models.

  4. 2022
    • Mar 22, 2022 NVIDIA H100 · This page

      The NVIDIA H100 is the first data-center GPU built on NVIDIA's Hopper architecture, announced in March 2022 with 80 billion transistors, HBM3 memory, FP8 Tensor Cores and a Transformer Engine aimed at large language models.

  5. 2023
    • Nov 13, 2023 NVIDIA H200 Tensor Core GPU

      NVIDIA's H200, announced in November 2023, is a data center GPU that was the first to use HBM3e memory, offering 141 GB at 4.8 TB/s — nearly double the A100's capacity — and roughly double the H100's inference speed on Llama 2 70B.

  6. 2024
    • Mar 18, 2024 NVIDIA B200 (Blackwell)

      NVIDIA's data-center GPU for the Blackwell generation, announced in March 2024 as the successor to Hopper, built from two joined dies and paired with NVLink and FP4 support for large-scale AI training and inference.

  7. 2026
    • Jan 2026 NVIDIA Rubin

      NVIDIA Rubin is NVIDIA’s six-chip AI platform and the successor to Blackwell, announced at CES 2026. It targets lower-cost AI token generation, with partner products and cloud instances scheduled for 2026.

20241

  1. MilestonexAI brings its Colossus supercomputer online in Memphis

    xAI's Colossus supercomputer in Memphis, Tennessee, built with NVIDIA, went into operation in 2024 with about 100,000 H100 GPUs. It was the main training system behind Grok.

20222

  1. PolicyUS imposes export controls on advanced computing chips to China

    On 7 October 2022 the US Bureau of Industry and Security issued two rules restricting China's access to advanced computing chips, supercomputer development and advanced chip manufacturing, setting thresholds that later shaped how Nvidia sold chips in China.

  2. ReleaseNVIDIA announces the Hopper architecture and H100

    At GTC on 22 March 2022, NVIDIA announced the Hopper architecture and its first Hopper GPU, the H100, headlined by a Transformer Engine and paired with new HBM3 memory and NVLink, with cloud instances planned from the third quarter of 2022.

Developed by1

NVIDIA

Foundation for1

NVIDIA H800

Successor of1

NVIDIA A100

Notes and sources

  1. NVIDIA Announces Hopper Architecture, the Next Generation of Accelerated Computinghttps://nvidianews.nvidia.com/news/nvidia-announces-hopper-architecture-the-next-generation-of-accelerated-computing
  2. NVIDIA H100 Tensor Core GPUhttps://www.nvidia.com/en-us/data-center/h100/
  3. NVIDIA Corporation Form 8-K (event date 26 August 2022)https://www.sec.gov/Archives/edgar/data/1045810/000104581022000146/nvda-20220826.htm

Cite this page: NVIDIA H100. TellWorld, https://www.tellworld.net/compute/nvidia-h100. Updated 2026-11-08